Average completion timelines for Committee of Adjustment Hearings and Consent applications by the City of Hamilton's Planning and Economic Development Department.
File available for download in the following formats:
A measure of Hamilton CMA’s economic diversity based on the structure of its economy as compared to a national average as provided by The Conference Board of Canada. The score...
File available for download in the following formats:
Inspections by the Building Division for Building Code Compliance during key stages of building permit construction. These inspections are required to ensure the construction...
File available for download in the following formats:
Percent of overall watermain and water service line repairs and replacements completed in Hamilton. Watermain and water service line emergencies can disrupt essential water...
File available for download in the following formats:
Percent of emergency sewer repairs and replacement completed in Hamilton. The City of Hamilton aims to have all urgent and emergent repairs completed within 2 days. Emergency...
File available for download in the following formats:
The total property taxes not collected (arrears) owed to the City of Hamilton as a percentage of the levy.
As reported to Municipal Benchmarking Network Canada (MBNC).
File available for download in the following formats:
Percentage of homes involved in a residential structure fire with working smoke alarms in Hamilton. This indicates the level of smoke alarm compliance in residential structures...
File available for download in the following formats:
Percent of sewer lateral repairs and replacements completed in Hamilton. Sewer laterals are privately-owned sewer service lines that connect a property to the City’s main sewer....
File available for download in the following formats: